title: "Palo Alto Hills, Palo Alto: ADU rules and designs"
description: "Palo Alto Hills, Palo Alto ADUs: 1 ADUs/JADUs permitted in 5 years, top designs, state and city ADU rules, fees and pre-approved plans."
url: https://bayarearebuild.com/palo-alto/palo-alto-hills/adu/
last_checked: 2026-11-19
---

[Home](https://bayarearebuild.com/) / [Palo Alto](https://bayarearebuild.com/palo-alto/) / [Palo Alto Hills](https://bayarearebuild.com/palo-alto/palo-alto-hills/) / ADUs

Palo Alto · Neighborhood ADU guide

# ADUs and JADUs in Palo Alto Hills

Palo Alto Hills had 1 ADUs and JADUs permitted from Nov 19, 2021 to Nov 16, 2026: 1 on their own permits and 0 as part of new homes; the most common type was detached backyard ADU (new build). State law allows a detached ADU of up to 800 sf, 16 ft tall, with 4 ft side and rear setbacks on any eligible lot. Data last checked 2026-11-19.

- **1**: ADUs and JADUs permitted, Nov 19, 2021 to Nov 16, 2026
- **1**: on their own ADU/JADU permit
- **0**: built as part of a new home
- **997 sf**: median stated size (n=1)
- **74**: residential lots
- **0%**: lots in a FEMA flood hazard area

## Lots in Palo Alto Hills

88 parcels in the city's Palo Alto Hills boundary[1], 74 of them in residential zones[2]. Typical residential lot: 35,785 to 43,886 sf (middle half), median width about 189 ft (GIS estimate), median year built 1971.

### Lot sizes

- <5,000: 0 · 0%
- 5,000-6,999: 0 · 0%
- 7,000-9,999: 0 · 0%
- 10,000-14,999: 0 · 0%
- 15,000+: 74 · 100%

### Zones

- RE: 74 · 100%

Also in this boundary: OS (12), PF (D) (2) (non-residential or uncompiled zones).

### Overlays and flags

- Single-story overlay (S): 0 · 0%
- FEMA flood hazard area (SFHA): 0 · 0%
- Historic inventory or district: 0 · 0%
- Substandard lot (city flag): 0 · 0%
- Flag lot: 5 · 7%
- Special setback line: 0 · 0%

R-1/RE lots that pass a first SB 9 screen (no flood or historic flag): 74 of 74 (100%). The city parcel report cannot compute FAR for 16 lots (creek, flag lot or easement).[2,3]

### Your lot

*(Interactive address lookup on the web page.)*

## ADU and JADU rules for lots in Palo Alto Hills

These rules apply citywide; the neighborhood numbers come from the city parcel and flood layers. Check your own lot with the lookup above. Concept screening only.

| Rule | What applies |
|---|---|
| Where ADUs are allowed | Any lot where single- or multi-family housing is a permitted use. The guidebook lists R-1 (and subdistricts), R-E, R-2, RMD, RM-20, RM-30, RM-40 and OS as eligible; CD-C, CD-S, CD-N, CN, CC, CC(2), CS and PTOD "may be permitted" (ask the Planner on Duty).[4] |
| How many units | A lot with a single-family home can have 2 ADUs and 1 JADU. Multi-family lots: conversion ADUs (at least 1, up to 25% of existing units) plus up to 8 detached ADUs, not more than the number of existing units.[4] |
| State-guaranteed detached ADU | Up to **800 sf**, **16 ft** tall (18 ft within 1/2 mile of transit or next to a multi-story home, plus 2 ft to match the main roof pitch), **4 ft** side and rear setbacks; allowed on any eligible lot regardless of floor-area and lot-coverage limits.[4,5] |
| Conversion of existing space | Attached conversion: up to 800 sf with up to 150 sf of expansion for entry and exit, separate entrance, no interior access to the main home. Detached accessory structure: no size cap; height stays at the existing structure or zone limit.[4] |
| City attached ADU | Up to **900 sf** (1 bedroom) or **1,000 sf** (2+ bedrooms); up to 800 sf may be added above the maximum floor area and lot coverage; 4 ft side and rear setbacks; height 25 ft or the zone limit, whichever is lower; at most 2 stories.[4] The code mirror also caps an attached ADU at 50% of the main home.[6] verify with the city |
| City detached ADU | Up to **900 sf** (1 bedroom) or **1,000 sf** (2+ bedrooms); at least 3 ft from the main home. The 2025 guidebook gives max height 25 ft in RE and 30 ft in OS[4]; the code mirror lists 30 ft in RE and 25 ft in OS and 16 ft (18 ft near transit) elsewhere.[6] verify with the city |
| JADU | Up to **500 sf**, inside the main home (existing or new), efficiency kitchen required, may share a bathroom and laundry, may have an interior door. A new-build JADU can add 500 sf above max floor area and lot coverage (800 sf total with an ADU). Owner occupancy of the home or the JADU and a recorded deed restriction are required.[4,7] |
| Parking | No parking is required for a new ADU. Garage or carport spaces converted to an ADU do not need to be replaced. Uncovered replacement parking is required when building a new home with a second unit and no covered parking.[4] |
| Design standards (city ADUs) | Entry facing a different property line than the main home (unless in the rear half of the lot or on a corner lot); obscured glazing or 5 ft sills for windows facing neighbors; exterior lights at 7 ft or below and pointed down; second-floor doors and decks may not face a neighboring property.[4] |
| Flood zones | ADUs in a flood zone get no height extension.[5] |
| Rent and sale | Rentals must be for 30 days or more. Only ADUs built by a qualified nonprofit can be sold separately from the main home.[4] |
| Impact-fee exemption | ADUs under 750 sf are exempt from city development impact fees. For ADUs of 750 sf or more the fee is proportional to the size of the main home. JADUs and garage or carport conversions with no floor-area expansion are exempt.[8,9] |
| School fee | PAUSD residential school fee $4.79 per sf; not applicable to JADUs or ADUs under 500 sf per the city guidebook.[10,4] State law exempts additions of 500 sf or less.[11] |
| SB 9 combination | ADUs and SB 9 can combine, but on a lot created by an SB 9 urban lot split the city does not have to allow more than two units per lot, counting ADUs and JADUs. The city guidebook points owners who want more than 2 ADUs and 1 JADU to its SB 9 information.[12,13,4] verify with the city |
| Review time limit | The city must say whether an ADU application is complete within 15 business days, and approve or deny a complete application within 60 days if a home already exists on the lot; otherwise it is deemed approved.[14,15] |

## Top 1 ADU designs in Palo Alto Hills

1 ADUs and JADUs in Palo Alto Hills from the city's open-data permit export (Nov 19, 2021 to Nov 16, 2026), typed from the permit descriptions[16]. ADUs built inside a new-home permit are counted from that permit; their valuation is part of the new home and is not shown. Valuation is the construction value on the permit, not a price quote.

Only 1 ADU permit here in five years, too few to rank with confidence. All types found are shown.

1. ### Detached backyard ADU (new build)
   - **1** ADUs/JADUs
   - **997 sf** median stated size (n=1; range 997 to 997 sf)
   - **$167k** median permit valuation (n=1)
   No public plans found for these ADU permits.
   Recent permits of this type
   - 3132 Alexis Dr · permit `23BLD-01907` · 997 sf · Permit Issued · opened 2023-07-27

## Recently approved ADU and JADU permits in Palo Alto Hills

**Last updated Nov 19, 2026** · checked daily · city permit data through Nov 16, 2026 (the city refreshes its open-data export weekly)

No ADU/JADU permits were approved in Palo Alto Hills from Oct 21, 2026 to Nov 19, 2026. See the citywide list on the [ADU guide](https://bayarearebuild.com/palo-alto/adu/#approved).

"Approved" means the city issued the building permit. The approval date is the date the permit was marked "Permit Issued" in the Permit Issuance step of the record's processing status (workflow history) on the city's Accela Citizen Access portal. We check every new-home and ADU/JADU permit whose current status in the city's permit data is "Permit Issued". Permits that already moved on to "Finaled" or another status before a daily check saw them are not listed.[17,18,19]

### Permit processing time, last 3 months

| Permit type | Permits issued | Average days | Median days | Palo Alto Hills |
|---|---|---|---|---|
| ADUs | 13 | 252 | 204 | 0 issued here in 90 days; fewer than 3, so citywide figure only |
| JADUs | 3 | 212 | 223 | 0 issued here in 90 days; fewer than 3, so citywide figure only |

Calculated by Bay Area Rebuild from City of Palo Alto permit data[17,18,19]: calendar days from application (date the permit was opened) to issuance, for permits issued Aug 22, 2026 to Nov 19, 2026 (rolling 90 days, updated daily). Includes the applicant's time to respond to plan-check comments; it is not a city target or a promise. Last updated Nov 19, 2026.

## The city's pre-approved ADU plans

The city's ADU Plans Gallery lists these plans as **pre-approved**: already reviewed for building code, but they still need site planning, other applications and further review for your lot.[20] The city also offers a master-plan route for detached ADUs: master applications are filed under the address 250 Hamilton Avenue, then each site gets a site-specific permit.[21]

Pre-approved plan**Open layout 2-Bed 1-Bath ADU**Licensed Architect (as listed)

716 sf · Site-built · 2 bedrooms · 1 bathroom

[See the plan in the city gallery](https://cityofpaloalto.aduaccelerator.org/plan/a0AHp000014YYOGMA4/detail)

Pre-approved plan**Ashbury 330**Wellmade

434 sf · Site-built · 1 bedroom · 1 bathroom

[See the plan in the city gallery](https://cityofpaloalto.aduaccelerator.org/plan/a0APk00000KzFxtMAF/detail)

Pre-approved plan**Fillmore 330**Wellmade

343 sf · Site-built · Studio · 1 bathroom

[See the plan in the city gallery](https://cityofpaloalto.aduaccelerator.org/plan/a0APk00000L7y9pMAB/detail)

Pre-approved plan**ADORE Crema 667**ADORE Homes Inc.

667 sf · Prefabricated · 2 bedrooms · 2+ bathrooms

[See the plan in the city gallery](https://cityofpaloalto.aduaccelerator.org/plan/a0APk00000LhUUzMAN/detail)

Plan details as listed in the gallery on 2026-11-19. Plan images belong to the designers; we link to the gallery instead of copying them. Prices are set by each designer and are not published here.

## ADU fees and the permit path

| Fee (City of Palo Alto, FY 2027 unless noted) | Amount |
|---|---|
| Building permit, stand-alone detached ADU (not using a master plan) | $7,346 per permit |
| Master permit for a stand-alone detached ADU design | $2,653 per permit |
| Site-specific permit related to a master: prefab / site-built | $3,929 / $5,481 per permit |
| Building permit fees, range given in the 2025 guidebook | $2,000 to $8,000 |
| Development impact fees: ADUs under 750 sf, JADUs, garage conversions with no added floor area | Exempt |
| Development impact fees: ADUs 750 sf and over (proportional to the main home); guidebook range | $10,000 to $80,000 |
| Impact fee rates the proportional fee is based on (single family): parks; community center; library | $18.75; $1.44; $0.86 per sf |
| Impact fee rates (single family): public safety; general government | $1,383; $1,743 per unit |
| PAUSD school fee (not for JADUs or ADUs under 500 sf) | $4.79 per sf |
| Utility connection fees | not published (set by City of Palo Alto Utilities) |

Sources: ADU building fees[22]; impact fees and exemptions[8,9]; guidebook ranges and school-fee note[4]; school fee[10]. How the city prorates the impact fee for an ADU of 750 sf or more is not published as a formula.

[Step-by-step ADU permit process](https://bayarearebuild.com/palo-alto/adu-permit-process) [Citywide ADU guide](https://bayarearebuild.com/palo-alto/adu/)

## Sources and last-checked dates

1. [City of Palo Alto ArcGIS: Neighbourhood boundaries layer](https://services6.arcgis.com/evmyRZRrsopdeog7/arcgis/rest/services/Neighbourhood/FeatureServer/0)
   City of Palo Alto GIS · last checked 2026-11-19
2. [City of Palo Alto ArcGIS: AssessorsParcels layer (zone, lot size, city-computed FAR, coverage, setbacks, height, flood and historic flags)](https://services6.arcgis.com/evmyRZRrsopdeog7/arcgis/rest/services/AssessorsParcels/FeatureServer/0)
   City of Palo Alto GIS · last checked 2026-11-19
3. [City of Palo Alto ArcGIS: 100-Year Flood Map layer (FEMA zones)](https://services6.arcgis.com/evmyRZRrsopdeog7/arcgis/rest/services/100YearFloodMap/FeatureServer/0)
   City of Palo Alto GIS · last checked 2026-11-19
4. [City of Palo Alto: J/ADU Guidebook 2025 (PDF; ADU types, eligible zones, state and city standards, fees overview, timeline, FAQ)](https://www.paloalto.gov/files/assets/public/v/1/planning-amp-development-services/adu_jadu-handbook-2025.pdf)
   City of Palo Alto · last checked 2026-11-19
5. [Palo Alto Municipal Code 18.09.030 (state-exempt ADUs/JADUs, Table 1)](https://codelibrary.amlegal.com/codes/paloalto/latest/paloalto_ca/0-0-0-76738)
   American Legal (official online code) · last checked 2026-11-19
6. [PAMC 18.09.040 City-standard ADUs (Table 2, 800 sf FAR exclusion), via GoCodebook mirror](https://gocodebook.com/library/us/ca/palo-alto/sections/18.09.040) third-party mirror: verify with the city
   GoCodebook (third-party mirror) · last checked 2026-11-19
7. [City of Palo Alto: JADU deed restriction agreement process (Nov 15, 2023, PDF)](https://www.cityofpaloalto.org/files/assets/public/v/5/development-services/planning-review/1.-single-family-and-duplexes/jadu-deed-restriction-agreement-process-11-15-2023-one-page.pdf)
   City of Palo Alto · last checked 2026-11-19
8. [City of Palo Alto: Development Impact and In-Lieu Fees, as of Aug 17, 2026 (PDF)](https://www.paloalto.gov/files/assets/public/v/5/development-services/planning-review/6.-planning-fees/fy27-impact-fee-information-sheet.pdf)
   City of Palo Alto · last checked 2026-11-19
9. [City of Palo Alto: FY 2027 Adopted Municipal Fee Schedule, development impact fees with "ADUs under 750 sq ft exempt" notes (PDF p. 77)](https://www.paloalto.gov/files/assets/public/v/1/administrative-services/city-budgets/municipal-fee-schedules/fy-2027-adopted-municipal-fee-schedule.pdf)
   City of Palo Alto · last checked 2026-11-19
10. [Palo Alto Unified School District: School Impact Fees](https://www.pausd.org/about-us/funding/school-impact-fees)
   PAUSD · last checked 2026-11-19
11. [California Education Code § 17620 (school fees; ADUs of 500 sf or less exempt)](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=EDC&sectionNum=17620.)
   California Legislative Information · last checked 2026-11-19
12. [California HCD: SB 9 Fact Sheet (PDF)](https://www.hcd.ca.gov/sites/default/files/docs/planning-and-community/sb-9-fact-sheet.pdf)
   State of California · last checked 2026-11-18
13. [PAMC 18.42.180 SB 9 two-unit projects, via GoCodebook mirror](https://gocodebook.com/library/us/ca/palo-alto/sections/18.42.180) third-party mirror: verify with the city
   GoCodebook (third-party mirror) · last checked 2026-11-19
14. [California Government Code § 66317 (ADU permit: 15 business days for completeness, 60 days to approve or deny, deemed approved)](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66317.)
   California Legislative Information (official text; read via search index, site blocks automated fetch) · last checked 2026-11-19
15. [California HCD: Accessory Dwelling Unit Handbook, updated March 2026 (PDF)](https://www.hcd.ca.gov/sites/default/files/docs/policy-and-research/ADU-Handbook-Update.pdf)
   State of California · last checked 2026-11-19
16. [City of Palo Alto Open Data: Palo Alto Development Center Permits (Building module export, Dec 2017 to Nov 16, 2026)](http://data.paloalto.gov/dataviews/265480/palo-alto-development-center-permits-mar-2025-nov-2026/)
   City of Palo Alto Open Data · last checked 2026-11-18
17. [City of Palo Alto Open Data: Palo Alto Development Center Permits, current export (record status and status date, updated weekly by the city)](https://data.paloalto.gov/dataviews/265480/palo-alto-development-center-permits-mar-2025-nov-2026/)
   City of Palo Alto Open Data · last checked 2026-11-19
18. [City of Palo Alto PermitView (city GIS permit search: record status, status date and Accela record keys)](https://gis.cityofpaloalto.org/PermitView/)
   City of Palo Alto GIS · last checked 2026-11-19
19. [City of Palo Alto Accela Citizen Access: building permit and planning record pages (status, public attachments, plan sets)](https://aca-prod.accela.com/PALOALTO/)
   City of Palo Alto · last checked 2026-11-19
20. [City of Palo Alto ADU Plans Gallery (ADU Accelerator / Community Planning Collaborative)](https://cityofpaloalto.aduaccelerator.org/gallery)
   ADU Accelerator for the City of Palo Alto · last checked 2026-11-19
21. [City of Palo Alto: Master ADU permit submittal checklist (2026, PDF)](https://www.paloalto.gov/files/assets/public/v/3/development-services/building-permits/0.-building-permit-submittal-forms/master-adu-checklist-2026.pdf)
   City of Palo Alto · last checked 2026-11-19
22. [City of Palo Alto: FY 2027 Adopted Municipal Fee Schedule, Development Services building fees incl. ADU master-plan fees (PDF p. 67)](https://www.paloalto.gov/files/assets/public/v/1/administrative-services/city-budgets/municipal-fee-schedules/fy-2027-adopted-municipal-fee-schedule.pdf)
   City of Palo Alto · last checked 2026-11-19

Nothing on this page is invented. Missing figures are marked not published or not stated. See the [methodology](https://bayarearebuild.com/methodology).