ADUs in Palo Alto: what gets built, and where
Palo Alto permitted 551 ADUs and JADUs from Nov 19, 2021 to Nov 16, 2026: 364 on their own permits and 187 as part of new homes. The most common type was a detached backyard ADU (new build), and ADUs under 750 sf pay no city impact fees. Data last checked 2026-11-19.
Can I build an ADU on my lot?
Or pick a neighborhood
- Barron Park46 ADUs33 new
- Charleston Meadows18 ADUs8 new
- Charleston Terrace24 ADUs10 new
- College Terrace19 ADUs8 new
- Community Center19 ADUs10 new
- Crescent Park53 ADUs21 new
- Downtown North13 ADUs2 new
- Duveneck/St Francis28 ADUs13 new
- Evergreen Park6 ADUs2 new
- Fairmeadow8 ADUs3 new
- Green Acres26 ADUs6 new
- Greenmeadow8 ADUs3 new
- Leland Manor/Garland18 ADUs8 new
- Midtown/Midtown West101 ADUs57 new
- Oak Creek0 ADUs0 new
- Old Palo Alto51 ADUs25 new
- Palo Alto Hills1 ADUs0 new
- Palo Verde60 ADUs36 new
- Professorville2 ADUs1 new
- Research Park4 ADUs1 new
- Southgate10 ADUs4 new
- University Park3 ADUs0 new
- University South12 ADUs3 new
- Ventura16 ADUs5 new
Recently approved ADU and JADU permits
Last updated Nov 19, 2026 · checked daily · city permit data through Nov 16, 2026 (the city refreshes its open-data export weekly)
- No public elevationADU and JADU permits are approved ministerially, with no Planning plan set, and the building permit's public attachments list no documents (checked 2026-11-19).
1461 Dana Ave
26BLD-00857 · Detached new ADU
- Size on permit
- 361 sf
- Valuation on permit
- $60,421
- Applied
- Apr 1, 2026
- Days to issue
- 204
- No public elevationADU and JADU permits are approved ministerially, with no Planning plan set, and the building permit's public attachments list no documents (checked 2026-11-19).
1590 Madrono Ave
26BLD-00977 · Detached new ADU
- Size on permit
- not stated
- Valuation on permit
- $80,338
- Applied
- Apr 13, 2026
- Days to issue
- 191
Last 30 days, all neighborhoods
| Approved | Address | Neighborhood | Permit | Type | Size | Valuation | Drawing |
|---|---|---|---|---|---|---|---|
| Oct 22, 2026 | 1461 Dana Ave | Crescent Park | 26BLD-00857 | Detached new ADU | 361 sf | $60,421 | no public elevation |
| Oct 21, 2026 | 1590 Madrono Ave | Southgate | 26BLD-00977 | Detached new ADU | not stated | $80,338 | no public elevation |
Permit processing time, last 3 months
| Permit type | Permits issued | Average days | Median days |
|---|---|---|---|
| ADUs | 13 | 252 | 204 |
| JADUs | 3 | 212 | 223 |
What Palo Alto is building
All 551 ADUs and JADUs by type, from permit descriptions[3]. Detached ADUs are new builds unless the permit says conversion; stories were stated on only 6 permits, and no permit explicitly described a two-story detached ADU.
| # | ADU type | Count | Share | Median size | Median valuation |
|---|---|---|---|---|---|
| 01 | Detached backyard ADU (new build) | 143 | 26% | 742 sf | $109k |
| 02 | Attached ADU built with a new home | 115 | 21% | 748 sf | n/a (in new home) |
| 03 | Garage or carport converted to an ADU | 67 | 12% | 441 sf | $71k |
| 04 | JADU built into a new home | 62 | 11% | 484 sf | n/a (in new home) |
| 05 | Attached ADU added to an existing home | 54 | 10% | 592 sf | $143k |
| 06 | JADU in a converted garage | 36 | 7% | 410 sf | $111k |
| 07 | JADU converted inside the house | 24 | 4% | 385 sf | $135k |
| 08 | ADU converted from other existing space | 17 | 3% | 474 sf | $85k |
| 09 | Prefab or factory-built detached ADU | 11 | 2% | 570 sf | $87k |
| 10 | Detached ADU built with a new home | 10 | 2% | not stated | n/a (in new home) |
| 11 | Existing unit legalized as an ADU | 7 | 1% | 367 sf | $86k |
| 12 | ADU, type not stated on the permit | 4 | 1% | 752 sf | $152k |
| 13 | ADU over a garage | 1 | 0% | not stated | $148k |
Own ADU/JADU permits by year opened
ADUs in new-home permits by year opened
Size (stated on the permit)
Permit status
Top 5 ADU designs citywide
Example addresses are recent permits of each type, finaled or issued first.
- 01
Detached backyard ADU (new build)
143ADUs/JADUs742 sfmedian stated size (n=106; range 218 to 1,000 sf)$109kmedian permit valuation (n=142)No public plans found for these ADU permits.- 3715 Whitsell Av · permit
25BLD-03215· size not stated · Finaled · opened 2025-10-27 - 1103 Forest Av · permit
25BLD-02906· size not stated · Finaled · opened 2025-10-01 - 1211 Fulton St · permit
25BLD-01504· 273 sf · studio · Finaled · opened 2025-05-28
- 3715 Whitsell Av · permit
- 02
Attached ADU built with a new home
115ADUs/JADUs748 sfmedian stated size (n=56; range 243 to 999 sf)n/avaluation not separable from the new home
New home with this ADU type · 562 Irven Ct · building permit 26BLD-02949 · 25PLN-00275[7] - 3413 Ross Rd · permit
24BLD-01753· size not stated · Finaled · opened 2024-06-20 - 545 Georgia Av · permit
24BLD-00911· 750 sf · Finaled · opened 2024-04-03 - 862 Moreno Av · permit
24BLD-00754· 743 sf · Finaled · opened 2024-03-19
- 3413 Ross Rd · permit
- 03
Garage or carport converted to an ADU
67ADUs/JADUs441 sfmedian stated size (n=51; range 155 to 1,056 sf)$71kmedian permit valuation (n=67)No public plans found for these ADU permits.- 730 College Av · permit
25BLD-01771· size not stated · Finaled · opened 2025-06-23 - 3228 Ross Rd · permit
25BLD-01694· 401 sf · Finaled · opened 2025-06-13 - 329 Campesino Av · permit
25BLD-01137· 794 sf · 1 bd · Finaled · opened 2025-04-23
- 730 College Av · permit
- 04
JADU built into a new home
62ADUs/JADUs484 sfmedian stated size (n=26; range 236 to 522 sf)n/avaluation not separable from the new home
New home with this ADU type · 562 Irven Ct · building permit 26BLD-02949 · 25PLN-00275[7] - 1949 Edgewood Dr · permit
24BLD-03454· 483 sf · Finaled · opened 2024-12-10 - 543 Alger Dr · permit
24BLD-01528· size not stated · Finaled · opened 2024-06-04 - 985 Lincoln Av · permit
24BLD-00408· 493 sf · Finaled · opened 2024-02-12
- 1949 Edgewood Dr · permit
- 05
Attached ADU added to an existing home
54ADUs/JADUs592 sfmedian stated size (n=38; range 192 to 1,139 sf)$143kmedian permit valuation (n=54)No public plans found for these ADU permits.- 525 Center Dr, Unit A · permit
25BLD-03175· size not stated · Finaled · opened 2025-10-23 - 3727 Cass Wy · permit
25BLD-01211· 711 sf · Finaled · opened 2025-04-29 - 3920 Park Bl · permit
25BLD-00988· 499 sf · Finaled · opened 2025-04-08
- 525 Center Dr, Unit A · permit
ADUs in all 24 neighborhoods
Neighborhood from the city's boundary layer, joined on the parcel number[8,1]. 5 ADUs sit on parcels outside a mapped neighborhood and count only in the citywide totals.
| Neighborhood | ADUs/JADUs | Own permit | In new home | Most common type |
|---|---|---|---|---|
| Midtown/Midtown West | 101 | 67 | 34 | Detached backyard ADU (new build) |
| Palo Verde | 60 | 33 | 27 | Attached ADU built with a new home |
| Crescent Park | 53 | 39 | 14 | Detached backyard ADU (new build) |
| Old Palo Alto | 51 | 27 | 24 | Attached ADU built with a new home |
| Barron Park | 46 | 28 | 18 | Detached backyard ADU (new build) |
| Duveneck/St Francis | 28 | 18 | 10 | Attached ADU built with a new home |
| Green Acres | 26 | 20 | 6 | Attached ADU added to an existing home |
| Charleston Terrace | 24 | 15 | 9 | Detached backyard ADU (new build) |
| Community Center | 19 | 12 | 7 | Detached backyard ADU (new build) |
| College Terrace | 19 | 17 | 2 | Detached backyard ADU (new build) |
| Leland Manor/Garland | 18 | 11 | 7 | Detached backyard ADU (new build) |
| Charleston Meadows | 18 | 10 | 8 | Attached ADU built with a new home |
| Ventura | 16 | 12 | 4 | Detached backyard ADU (new build) |
| Downtown North | 13 | 10 | 3 | Detached backyard ADU (new build) |
| University South | 12 | 10 | 2 | Detached backyard ADU (new build) |
| Southgate | 10 | 5 | 5 | Attached ADU built with a new home |
| Greenmeadow | 8 | 7 | 1 | Attached ADU added to an existing home |
| Fairmeadow | 8 | 5 | 3 | Attached ADU built with a new home |
| Evergreen Park | 6 | 4 | 2 | Attached ADU built with a new home |
| Research Park | 4 | 3 | 1 | Detached backyard ADU (new build) |
| University Park | 3 | 3 | 0 | Detached backyard ADU (new build) |
| Professorville | 2 | 2 | 0 | Detached backyard ADU (new build) |
| Palo Alto Hills | 1 | 1 | 0 | Detached backyard ADU (new build) |
| Oak Creek | 0 | 0 | 0 | none |
The city's pre-approved ADU plans
The city's ADU Plans Gallery lists these plans as pre-approved: already reviewed for building code, but they still need site planning, other applications and further review for your lot.[9] The city also offers a master-plan route for detached ADUs: master applications are filed under the address 250 Hamilton Avenue, then each site gets a site-specific permit.[10]
716 sf · Site-built · 2 bedrooms · 1 bathroom
See the plan in the city gallery434 sf · Site-built · 1 bedroom · 1 bathroom
See the plan in the city gallery343 sf · Site-built · Studio · 1 bathroom
See the plan in the city gallery667 sf · Prefabricated · 2 bedrooms · 2+ bathrooms
See the plan in the city galleryState and city ADU rules in one table
Read the city's J/ADU Guidebook 2025 for drawings of each type.[2]
| Rule | What applies |
|---|---|
| Where ADUs are allowed | Any lot where single- or multi-family housing is a permitted use. The guidebook lists R-1 (and subdistricts), R-E, R-2, RMD, RM-20, RM-30, RM-40 and OS as eligible; CD-C, CD-S, CD-N, CN, CC, CC(2), CS and PTOD "may be permitted" (ask the Planner on Duty).[2] |
| How many units | A lot with a single-family home can have 2 ADUs and 1 JADU. Multi-family lots: conversion ADUs (at least 1, up to 25% of existing units) plus up to 8 detached ADUs, not more than the number of existing units.[2] |
| State-guaranteed detached ADU | Up to 800 sf, 16 ft tall (18 ft within 1/2 mile of transit or next to a multi-story home, plus 2 ft to match the main roof pitch), 4 ft side and rear setbacks; allowed on any eligible lot regardless of floor-area and lot-coverage limits.[2,11] |
| Conversion of existing space | Attached conversion: up to 800 sf with up to 150 sf of expansion for entry and exit, separate entrance, no interior access to the main home. Detached accessory structure: no size cap; height stays at the existing structure or zone limit.[2] |
| City attached ADU | Up to 900 sf (1 bedroom) or 1,000 sf (2+ bedrooms); up to 800 sf may be added above the maximum floor area and lot coverage; 4 ft side and rear setbacks; height 25 ft or the zone limit, whichever is lower; at most 2 stories.[2] The code mirror also caps an attached ADU at 50% of the main home.[12] verify with the city |
| City detached ADU | Up to 900 sf (1 bedroom) or 1,000 sf (2+ bedrooms); at least 3 ft from the main home. The 2025 guidebook gives max height 25 ft in RE and 30 ft in OS[2]; the code mirror lists 30 ft in RE and 25 ft in OS and 16 ft (18 ft near transit) elsewhere.[12] verify with the city |
| JADU | Up to 500 sf, inside the main home (existing or new), efficiency kitchen required, may share a bathroom and laundry, may have an interior door. A new-build JADU can add 500 sf above max floor area and lot coverage (800 sf total with an ADU). Owner occupancy of the home or the JADU and a recorded deed restriction are required.[2,13] |
| Parking | No parking is required for a new ADU. Garage or carport spaces converted to an ADU do not need to be replaced. Uncovered replacement parking is required when building a new home with a second unit and no covered parking.[2] |
| Design standards (city ADUs) | Entry facing a different property line than the main home (unless in the rear half of the lot or on a corner lot); obscured glazing or 5 ft sills for windows facing neighbors; exterior lights at 7 ft or below and pointed down; second-floor doors and decks may not face a neighboring property.[2] |
| Flood zones | ADUs in a flood zone get no height extension.[11] |
| Rent and sale | Rentals must be for 30 days or more. Only ADUs built by a qualified nonprofit can be sold separately from the main home.[2] |
| Impact-fee exemption | ADUs under 750 sf are exempt from city development impact fees. For ADUs of 750 sf or more the fee is proportional to the size of the main home. JADUs and garage or carport conversions with no floor-area expansion are exempt.[14,15] |
| School fee | PAUSD residential school fee $4.79 per sf; not applicable to JADUs or ADUs under 500 sf per the city guidebook.[16,2] State law exempts additions of 500 sf or less.[17] |
| SB 9 combination | ADUs and SB 9 can combine, but on a lot created by an SB 9 urban lot split the city does not have to allow more than two units per lot, counting ADUs and JADUs. The city guidebook points owners who want more than 2 ADUs and 1 JADU to its SB 9 information.[18,19,2] verify with the city |
| Review time limit | The city must say whether an ADU application is complete within 15 business days, and approve or deny a complete application within 60 days if a home already exists on the lot; otherwise it is deemed approved.[20,21] |
ADU fees
| Fee (City of Palo Alto, FY 2027 unless noted) | Amount |
|---|---|
| Building permit, stand-alone detached ADU (not using a master plan) | $7,346 per permit |
| Master permit for a stand-alone detached ADU design | $2,653 per permit |
| Site-specific permit related to a master: prefab / site-built | $3,929 / $5,481 per permit |
| Building permit fees, range given in the 2025 guidebook | $2,000 to $8,000 |
| Development impact fees: ADUs under 750 sf, JADUs, garage conversions with no added floor area | Exempt |
| Development impact fees: ADUs 750 sf and over (proportional to the main home); guidebook range | $10,000 to $80,000 |
| Impact fee rates the proportional fee is based on (single family): parks; community center; library | $18.75; $1.44; $0.86 per sf |
| Impact fee rates (single family): public safety; general government | $1,383; $1,743 per unit |
| PAUSD school fee (not for JADUs or ADUs under 500 sf) | $4.79 per sf |
| Utility connection fees | not published (set by City of Palo Alto Utilities) |
Frequently asked questions
How big can an ADU be in Palo Alto?
A detached ADU of up to 800 sf is allowed on any eligible lot. Under the city standards an ADU can be up to 900 sf with one bedroom or 1,000 sf with two or more bedrooms. A JADU is limited to 500 sf.[2]
How many ADUs can I build on a single-family lot?
A lot with a single-family home can have two ADUs and one JADU.[2]
Do I need to add parking for an ADU?
No parking is required for a new ADU, and garage or carport spaces converted to an ADU do not need to be replaced.[2]
Are ADUs exempt from impact fees?
ADUs under 750 sf are exempt from Palo Alto development impact fees, as are JADUs and garage conversions that add no floor area. For larger ADUs the fee is proportional to the size of the main home.[14,15]
How long does the city have to approve an ADU permit?
The city must decide whether the application is complete within 15 business days, and approve or deny a complete application within 60 days when a home already exists on the lot.[20]
Does Palo Alto have pre-approved ADU plans?
Yes. The city ADU Plans Gallery lists four pre-approved plans from 343 to 716 sf, one of them prefabricated. They still need site planning and review for your lot.[9]
How the ADU data is built
- Source: the city's open-data permit export (Building module), permits opened Nov 19, 2021 to Nov 16, 2026[3].
- Own ADU/JADU permits: 420 permits mention an ADU, JADU or accessory dwelling unit. We dropped 16 abandoned and 5 expired permits, 19 that only mention an ADU (for example work on an existing ADU, an ADU under a separate permit, "not a JADU", or a citywide master plan) and 9 duplicate permits for the same ADU on the same parcel (keeping the most advanced status).
- ADUs in new homes: 187 ADUs or JADUs named inside new single-family home permits (teardown-rebuild permits from our new-home dataset, plus new-home permits found in the ADU search). When a rebuild's detached ADU has its own permit, it is counted once, on that permit, and flagged as on a lot with a new home (25 such permits).
- Type comes only from the permit description, in this order: legalization, JADU, prefab/factory-built, ADU over a garage, garage or carport conversion, other conversion, detached, attached addition. Size and bedrooms are recorded only when the description states them; otherwise not stated.
- Valuation is the job value on standalone permits. For ADUs inside a new-home permit it cannot be separated and is not shown.
Sources and last-checked dates
- City of Palo Alto ArcGIS: AssessorsParcels layer (zone, lot size, city-computed FAR, coverage, setbacks, height, flood and historic flags)
- City of Palo Alto: J/ADU Guidebook 2025 (PDF; ADU types, eligible zones, state and city standards, fees overview, timeline, FAQ)
- City of Palo Alto Open Data: Palo Alto Development Center Permits (Building module export, Dec 2017 to Nov 16, 2026)
- City of Palo Alto Open Data: Palo Alto Development Center Permits, current export (record status and status date, updated weekly by the city)
- City of Palo Alto PermitView (city GIS permit search: record status, status date and Accela record keys)
- City of Palo Alto Accela Citizen Access: building permit and planning record pages (status, public attachments, plan sets)
- City of Palo Alto Accela Citizen Access (planning records and Individual Review plan sets)
- City of Palo Alto ArcGIS: Neighbourhood boundaries layer
- City of Palo Alto ADU Plans Gallery (ADU Accelerator / Community Planning Collaborative)
- City of Palo Alto: Master ADU permit submittal checklist (2026, PDF)
- Palo Alto Municipal Code 18.09.030 (state-exempt ADUs/JADUs, Table 1)
- PAMC 18.09.040 City-standard ADUs (Table 2, 800 sf FAR exclusion), via GoCodebook mirror third-party mirror: verify with the city
- City of Palo Alto: JADU deed restriction agreement process (Nov 15, 2023, PDF)
- City of Palo Alto: Development Impact and In-Lieu Fees, as of Aug 17, 2026 (PDF)
- City of Palo Alto: FY 2027 Adopted Municipal Fee Schedule, development impact fees with "ADUs under 750 sq ft exempt" notes (PDF p. 77)
- Palo Alto Unified School District: School Impact Fees
- California Education Code § 17620 (school fees; ADUs of 500 sf or less exempt)
- California HCD: SB 9 Fact Sheet (PDF)
- PAMC 18.42.180 SB 9 two-unit projects, via GoCodebook mirror third-party mirror: verify with the city
- California Government Code § 66317 (ADU permit: 15 business days for completeness, 60 days to approve or deny, deemed approved)
- California HCD: Accessory Dwelling Unit Handbook, updated March 2026 (PDF)
- City of Palo Alto: FY 2027 Adopted Municipal Fee Schedule, Development Services building fees incl. ADU master-plan fees (PDF p. 67)