Palo Alto · Neighborhood ADU guide

ADUs and JADUs in Southgate

Southgate had 10 ADUs and JADUs permitted from Nov 19, 2021 to Nov 16, 2026: 5 on their own permits and 5 as part of new homes; the most common type was attached ADU built with a new home. State law allows a detached ADU of up to 800 sf, 16 ft tall, with 4 ft side and rear setbacks on any eligible lot. Data last checked 2026-11-19.

10ADUs and JADUs permitted, Nov 19, 2021 to Nov 16, 2026
5on their own ADU/JADU permit
5built as part of a new home
498 sfmedian stated size (n=6)
222residential lots
0%lots in a FEMA flood hazard area
PA-01 · Parcels

Lots in Southgate

225 parcels in the city's Southgate boundary[1], 222 of them in residential zones[2]. Typical residential lot: 5,806 to 7,242 sf (middle half), median width about 60 ft (GIS estimate), median year built 1938.0.

Lot sizes

<5,0000 · 0%
5,000-6,999157 · 71%
7,000-9,99956 · 25%
10,000-14,9996 · 3%
15,000+3 · 1%

Zones

R-1209 · 94%
RM-2013 · 6%

Also in this boundary: PF (3) (non-residential or uncompiled zones).

Overlays and flags

Single-story overlay (S)0 · 0%
FEMA flood hazard area (SFHA)0 · 0%
Historic inventory or district6 · 3%
Substandard lot (city flag)0 · 0%
Flag lot0 · 0%
Special setback line0 · 0%

R-1/RE lots that pass a first SB 9 screen (no flood or historic flag): 203 of 209 (97%).[2,3]

Your lot

Runs in your browser on the city parcel layer (20,000+ lots). Shows ADU and JADU options for the lot. Concept screening only, not a zoning determination.
PA-02 · ADU rules

ADU and JADU rules for lots in Southgate

These rules apply citywide; the neighborhood numbers come from the city parcel and flood layers. Check your own lot with the lookup above. Concept screening only.

RuleWhat applies
Where ADUs are allowedAny lot where single- or multi-family housing is a permitted use. The guidebook lists R-1 (and subdistricts), R-E, R-2, RMD, RM-20, RM-30, RM-40 and OS as eligible; CD-C, CD-S, CD-N, CN, CC, CC(2), CS and PTOD "may be permitted" (ask the Planner on Duty).[4]
How many unitsA lot with a single-family home can have 2 ADUs and 1 JADU. Multi-family lots: conversion ADUs (at least 1, up to 25% of existing units) plus up to 8 detached ADUs, not more than the number of existing units.[4]
State-guaranteed detached ADUUp to 800 sf, 16 ft tall (18 ft within 1/2 mile of transit or next to a multi-story home, plus 2 ft to match the main roof pitch), 4 ft side and rear setbacks; allowed on any eligible lot regardless of floor-area and lot-coverage limits.[4,5]
Conversion of existing spaceAttached conversion: up to 800 sf with up to 150 sf of expansion for entry and exit, separate entrance, no interior access to the main home. Detached accessory structure: no size cap; height stays at the existing structure or zone limit.[4]
City attached ADUUp to 900 sf (1 bedroom) or 1,000 sf (2+ bedrooms); up to 800 sf may be added above the maximum floor area and lot coverage; 4 ft side and rear setbacks; height 25 ft or the zone limit, whichever is lower; at most 2 stories.[4] The code mirror also caps an attached ADU at 50% of the main home.[6] verify with the city
City detached ADUUp to 900 sf (1 bedroom) or 1,000 sf (2+ bedrooms); at least 3 ft from the main home. The 2025 guidebook gives max height 25 ft in RE and 30 ft in OS[4]; the code mirror lists 30 ft in RE and 25 ft in OS and 16 ft (18 ft near transit) elsewhere.[6] verify with the city
JADUUp to 500 sf, inside the main home (existing or new), efficiency kitchen required, may share a bathroom and laundry, may have an interior door. A new-build JADU can add 500 sf above max floor area and lot coverage (800 sf total with an ADU). Owner occupancy of the home or the JADU and a recorded deed restriction are required.[4,7]
ParkingNo parking is required for a new ADU. Garage or carport spaces converted to an ADU do not need to be replaced. Uncovered replacement parking is required when building a new home with a second unit and no covered parking.[4]
Design standards (city ADUs)Entry facing a different property line than the main home (unless in the rear half of the lot or on a corner lot); obscured glazing or 5 ft sills for windows facing neighbors; exterior lights at 7 ft or below and pointed down; second-floor doors and decks may not face a neighboring property.[4]
Flood zonesADUs in a flood zone get no height extension.[5]
Rent and saleRentals must be for 30 days or more. Only ADUs built by a qualified nonprofit can be sold separately from the main home.[4]
Impact-fee exemptionADUs under 750 sf are exempt from city development impact fees. For ADUs of 750 sf or more the fee is proportional to the size of the main home. JADUs and garage or carport conversions with no floor-area expansion are exempt.[8,9]
School feePAUSD residential school fee $4.79 per sf; not applicable to JADUs or ADUs under 500 sf per the city guidebook.[10,4] State law exempts additions of 500 sf or less.[11]
SB 9 combinationADUs and SB 9 can combine, but on a lot created by an SB 9 urban lot split the city does not have to allow more than two units per lot, counting ADUs and JADUs. The city guidebook points owners who want more than 2 ADUs and 1 JADU to its SB 9 information.[12,13,4] verify with the city
Review time limitThe city must say whether an ADU application is complete within 15 business days, and approve or deny a complete application within 60 days if a home already exists on the lot; otherwise it is deemed approved.[14,15]
PA-03 · Designs

Top 5 ADU designs in Southgate

10 ADUs and JADUs in Southgate from the city's open-data permit export (Nov 19, 2021 to Nov 16, 2026), typed from the permit descriptions[16]. ADUs built inside a new-home permit are counted from that permit; their valuation is part of the new home and is not shown. Valuation is the construction value on the permit, not a price quote.

  1. 01

    Attached ADU built with a new home

    4ADUs/JADUs588 sfmedian stated size (n=3; range 408 to 770 sf)n/avaluation not separable from the new home
    Elevation drawing of the new home at 1666 Madrono Av, Palo Alto (ADU type: attached ADU built with a new home), from public plan set 25PLN-00091
    New home with this ADU type · 1666 Madrono Av · building permit 25BLD-03724 · 25PLN-00091[17]
    Recent permits of this type
    • 1531 El Camino Real · permit 25BLD-02468 · 408 sf · Permit Issued · opened 2025-08-25
    • 1540 Escobita Av · permit 22BLD-00399 · 588 sf · Permit Issued · opened 2022-02-09
    • 30 Churchill Av · permit 24BLD-02963 · 770 sf · In Plan Check · opened 2024-10-16
  2. 02

    Detached backyard ADU (new build)

    3ADUs/JADUs796 sfmedian stated size (n=1; range 796 to 796 sf)$97kmedian permit valuation (n=3)

    bedrooms stated: 2 (1).

    No public plans found for these ADU permits.
    Recent permits of this type
    • 50 Churchill Av · permit 22BLD-00486 · 796 sf · Finaled · opened 2022-02-17
    • 1590 Madrono Av · permit 26BLD-00977 · size not stated · Permit Issued · opened 2026-04-13
    • 214 Sequoia Av · permit 25BLD-01149 · size not stated · 2 bd · Pending Resubmittal · opened 2025-04-24
  3. 03

    Garage or carport converted to an ADU

    1ADUs/JADUsnot statedsize not stated on these permits$95kmedian permit valuation (n=1)
    No public plans found for these ADU permits.
    Recent permits of this type
    • 1789 Park Bl, Unit A · permit 23BLD-00816 · size not stated · Finaled · opened 2023-04-10
  4. 04

    JADU built into a new home

    1ADUs/JADUs236 sfmedian stated size (n=1; range 236 to 236 sf)n/avaluation not separable from the new home
    Elevation drawing of the new home at 30 Churchill Av, Palo Alto (ADU type: jADU built into a new home), from public plan set 22PLN-00270
    New home with this ADU type · 30 Churchill Av · building permit 24BLD-02963 · 22PLN-00270[17]
    Recent permits of this type
    • 30 Churchill Av · permit 24BLD-02963 · 236 sf · In Plan Check · opened 2024-10-16
  5. 05

    JADU in a converted garage

    1ADUs/JADUs332 sfmedian stated size (n=1; range 332 to 332 sf)$41kmedian permit valuation (n=1)
    No public plans found for these ADU permits.
    Recent permits of this type
    • 302 Manzanita Av · permit 22BLD-02878 · 332 sf · Finaled · opened 2022-11-18
PA-04 · Recently approved

Recently approved ADU and JADU permits in Southgate

Last updated Nov 19, 2026 · checked daily · city permit data through Nov 16, 2026 (the city refreshes its open-data export weekly)

1 ADU/JADU permit approved in Southgate from Oct 21, 2026 to Nov 19, 2026.

  • No public elevationADU and JADU permits are approved ministerially, with no Planning plan set, and the building permit's public attachments list no documents (checked 2026-11-19).
    Approved Oct 21, 2026

    1590 Madrono Ave

    26BLD-00977 · Detached new ADU

    Size on permit
    not stated
    Valuation on permit
    $80,338
    Applied
    Apr 13, 2026
    Days to issue
    191

    City description: “Res: Detached ADU and upgrade main panel to 320 amps.”

"Approved" means the city issued the building permit. The approval date is the date the permit was marked "Permit Issued" in the Permit Issuance step of the record's processing status (workflow history) on the city's Accela Citizen Access portal. We check every new-home and ADU/JADU permit whose current status in the city's permit data is "Permit Issued". Permits that already moved on to "Finaled" or another status before a daily check saw them are not listed.[18,19,20]

Permit processing time, last 3 months

Permit typePermits issuedAverage daysMedian daysSouthgate
ADUs132522041 issued here in 90 days; fewer than 3, so citywide figure only
JADUs32122230 issued here in 90 days; fewer than 3, so citywide figure only

Calculated by Bay Area Rebuild from City of Palo Alto permit data[18,19,20]: calendar days from application (date the permit was opened) to issuance, for permits issued Aug 22, 2026 to Nov 19, 2026 (rolling 90 days, updated daily). Includes the applicant's time to respond to plan-check comments; it is not a city target or a promise. Last updated Nov 19, 2026.

PA-05 · Pre-approved plans

The city's pre-approved ADU plans

The city's ADU Plans Gallery lists these plans as pre-approved: already reviewed for building code, but they still need site planning, other applications and further review for your lot.[21] The city also offers a master-plan route for detached ADUs: master applications are filed under the address 250 Hamilton Avenue, then each site gets a site-specific permit.[22]

Pre-approved planOpen layout 2-Bed 1-Bath ADULicensed Architect (as listed)

716 sf · Site-built · 2 bedrooms · 1 bathroom

See the plan in the city gallery
Pre-approved planAshbury 330Wellmade

434 sf · Site-built · 1 bedroom · 1 bathroom

See the plan in the city gallery
Pre-approved planFillmore 330Wellmade

343 sf · Site-built · Studio · 1 bathroom

See the plan in the city gallery
Pre-approved planADORE Crema 667ADORE Homes Inc.

667 sf · Prefabricated · 2 bedrooms · 2+ bathrooms

See the plan in the city gallery

Plan details as listed in the gallery on 2026-11-19. Plan images belong to the designers; we link to the gallery instead of copying them. Prices are set by each designer and are not published here.

PA-06 · Fees and permits

ADU fees and the permit path

Fee (City of Palo Alto, FY 2027 unless noted)Amount
Building permit, stand-alone detached ADU (not using a master plan)$7,346 per permit
Master permit for a stand-alone detached ADU design$2,653 per permit
Site-specific permit related to a master: prefab / site-built$3,929 / $5,481 per permit
Building permit fees, range given in the 2025 guidebook$2,000 to $8,000
Development impact fees: ADUs under 750 sf, JADUs, garage conversions with no added floor areaExempt
Development impact fees: ADUs 750 sf and over (proportional to the main home); guidebook range$10,000 to $80,000
Impact fee rates the proportional fee is based on (single family): parks; community center; library$18.75; $1.44; $0.86 per sf
Impact fee rates (single family): public safety; general government$1,383; $1,743 per unit
PAUSD school fee (not for JADUs or ADUs under 500 sf)$4.79 per sf
Utility connection feesnot published (set by City of Palo Alto Utilities)

Sources: ADU building fees[23]; impact fees and exemptions[8,9]; guidebook ranges and school-fee note[4]; school fee[10]. How the city prorates the impact fee for an ADU of 750 sf or more is not published as a formula.

Step-by-step ADU permit process Citywide ADU guide

PA-07 · Sources

Sources and last-checked dates

  1. City of Palo Alto ArcGIS: Neighbourhood boundaries layer
    City of Palo Alto GIS · last checked 2026-11-19
  2. City of Palo Alto ArcGIS: AssessorsParcels layer (zone, lot size, city-computed FAR, coverage, setbacks, height, flood and historic flags)
    City of Palo Alto GIS · last checked 2026-11-19
  3. City of Palo Alto ArcGIS: 100-Year Flood Map layer (FEMA zones)
    City of Palo Alto GIS · last checked 2026-11-19
  4. City of Palo Alto: J/ADU Guidebook 2025 (PDF; ADU types, eligible zones, state and city standards, fees overview, timeline, FAQ)
    City of Palo Alto · last checked 2026-11-19
  5. Palo Alto Municipal Code 18.09.030 (state-exempt ADUs/JADUs, Table 1)
    American Legal (official online code) · last checked 2026-11-19
  6. PAMC 18.09.040 City-standard ADUs (Table 2, 800 sf FAR exclusion), via GoCodebook mirror third-party mirror: verify with the city
    GoCodebook (third-party mirror) · last checked 2026-11-19
  7. City of Palo Alto: JADU deed restriction agreement process (Nov 15, 2023, PDF)
    City of Palo Alto · last checked 2026-11-19
  8. City of Palo Alto: Development Impact and In-Lieu Fees, as of Aug 17, 2026 (PDF)
    City of Palo Alto · last checked 2026-11-19
  9. City of Palo Alto: FY 2027 Adopted Municipal Fee Schedule, development impact fees with "ADUs under 750 sq ft exempt" notes (PDF p. 77)
    City of Palo Alto · last checked 2026-11-19
  10. Palo Alto Unified School District: School Impact Fees
    PAUSD · last checked 2026-11-19
  11. California Education Code § 17620 (school fees; ADUs of 500 sf or less exempt)
    California Legislative Information · last checked 2026-11-19
  12. California HCD: SB 9 Fact Sheet (PDF)
    State of California · last checked 2026-11-18
  13. PAMC 18.42.180 SB 9 two-unit projects, via GoCodebook mirror third-party mirror: verify with the city
    GoCodebook (third-party mirror) · last checked 2026-11-19
  14. California Government Code § 66317 (ADU permit: 15 business days for completeness, 60 days to approve or deny, deemed approved)
    California Legislative Information (official text; read via search index, site blocks automated fetch) · last checked 2026-11-19
  15. California HCD: Accessory Dwelling Unit Handbook, updated March 2026 (PDF)
    State of California · last checked 2026-11-19
  16. City of Palo Alto Open Data: Palo Alto Development Center Permits (Building module export, Dec 2017 to Nov 16, 2026)
    City of Palo Alto Open Data · last checked 2026-11-18
  17. City of Palo Alto Accela Citizen Access (planning records and Individual Review plan sets)
    City of Palo Alto · last checked 2026-11-19
  18. City of Palo Alto Open Data: Palo Alto Development Center Permits, current export (record status and status date, updated weekly by the city)
    City of Palo Alto Open Data · last checked 2026-11-19
  19. City of Palo Alto PermitView (city GIS permit search: record status, status date and Accela record keys)
    City of Palo Alto GIS · last checked 2026-11-19
  20. City of Palo Alto Accela Citizen Access: building permit and planning record pages (status, public attachments, plan sets)
    City of Palo Alto · last checked 2026-11-19
  21. City of Palo Alto ADU Plans Gallery (ADU Accelerator / Community Planning Collaborative)
    ADU Accelerator for the City of Palo Alto · last checked 2026-11-19
  22. City of Palo Alto: Master ADU permit submittal checklist (2026, PDF)
    City of Palo Alto · last checked 2026-11-19
  23. City of Palo Alto: FY 2027 Adopted Municipal Fee Schedule, Development Services building fees incl. ADU master-plan fees (PDF p. 67)
    City of Palo Alto · last checked 2026-11-19

Nothing on this page is invented. Missing figures are marked not published or not stated. See the methodology.

Free concept plan

Thinking about an ADU or JADU?

Request a free, no-obligation ADU concept plan: where a detached, attached or garage-conversion ADU could fit on your lot under the public state and city rules. It is a concept for discussion, not construction drawings and not a zoning determination. Bay Area Rebuild is an information service, not a licensed contractor. The request form is not connected yet.